Construction Warranty vs. Statute of Limitations Between Builder and Owner

Like the strings of a marionette puppet, after the completion of a New York construction project there are various legal theories that serve as ties between the builder and the owner. For the builder, the sooner these lingering ties can be removed the less exposure they face for claims of defects. For the owners, the longer they are able to establish these connections the longer they may have legal recourse against the builder for defects, should that be necessary.

Continue reading “Construction Warranty vs. Statute of Limitations Between Builder and Owner”

Defects By Design; Who is Liable for Bad Plans?

Construction is filled with countless risks, from weather conditions, labor strikes, material unavailability, subsurface conditions, inaccurate plans, and specifications, among others variables. Each has the potential to delay the project, cause increased completion costs, and increase the likelihood of disputes, liens, or litigation. Problems stemming from inaccurate plans and specs can quickly become the obstacles of others beyond just the design professional itself.
Continue reading “Defects By Design; Who is Liable for Bad Plans?”

Homeowners Unable To Recover For Emotional Distress In Construction Disputes

Many homeowners who consult with me regarding construction disputes are not only financially damaged but emotionally distressed, and understandably so. Our homes are not only our biggest financial investments but our sanctuaries, and misconduct by unscrupulous contractors that damages those sanctuaries makes us feel that we have no place of safety and, in some instances, makes us worry that we may be homeless altogether. Thus, the question is often posed to me whether homeowners can collect damages for emotional distress that results from construction contract disputes, in addition to their economic damages.

Continue reading “Homeowners Unable To Recover For Emotional Distress In Construction Disputes”

Construction Defects in New York; Part 6 of 6 – Time Limits

This is a continuing article series on Construction Defects in New York, These include an introduction (part 1), design defects (part 2), defective construction (part 3), improper materials (part 4), improper installations (part 5) and finally important time limitations which apply to seeking legal action for defective construction in New York (part 6).

Although construction litigation can be complex and often requires expert testimony, one of the most complicated areas is simply determining the timeframe a party has to bring forth an action in New York.

Continue reading “Construction Defects in New York; Part 6 of 6 – Time Limits”

Construction Defects in New York; Part 5 of 6 – Improper Installation

This is a continuing article series on Construction Defects in New York, These include an introduction (part 1), design defects (part 2), defective construction (part 3), improper materials (part 4), improper installations (part 5) and finally important time limitations which apply to seeking legal action for defective construction in New York (part 6).

Construction defects relating to materials can also be based on their installation. If products are installed incorrectly this can result in an unacceptable condition to the project owner.

Continue reading “Construction Defects in New York; Part 5 of 6 – Improper Installation”

Construction Defects in New York; Part 4 of 6 – Improper Materials

This is a continuing article series on Construction Defects in New York, These include an introduction (part 1), design defects (part 2), defective construction (part 3), improper materials (part 4), improper installations (part 5) and finally important time limitations which apply to seeking legal action for defective construction in New York (part 6).

Even where designs are to the correct level of competency and the construction has been performed with due diligence and care, problems may still arise on a project.

Continue reading “Construction Defects in New York; Part 4 of 6 – Improper Materials”

Construction Defects in New York; Part 3 of 6 – Defective Construction

This is a continuing article series on Construction Defects in New York, These include an introduction (part 1), design defects (part 2), defective construction (part 3), improper materials (part 4), improper installations (part 5) and finally important time limitations which apply to seeking legal action for defective construction in New York (part 6).

For a defect to be construction based, it can range in scope from a contractors failure to perform to completion of the project, to gross deviations from the approved construction plans and specifications.

Continue reading “Construction Defects in New York; Part 3 of 6 – Defective Construction”

Construction Defects in New York, Part 2 of 6 – Design Defects

This is a continuing article series on Construction Defects in New York, These include an introduction (part 1), design defects (part 2), defective construction (part 3), improper materials (part 4), improper installations (part 5) and finally important time limitations which apply to seeking legal action for defective construction in New York (part 6).

Defects in construction design demonstrate themselves in various and wide-ranging ways, and sometimes by the actions the defects cause others to do.

Continue reading “Construction Defects in New York, Part 2 of 6 – Design Defects”

Construction Defects in New York; Part 1 of 6 – An Introduction

Defects exist throughout all construction projects and it’s likely no construction project is ever completed perfectly. In New York construction however, perfection is not the legal standard by which construction is generally measured. The standard used to judge completed construction is the ordinary and reasonable skill that is usually exercised by architects, engineers, contractors and others in that work.[1]Therefore, not all defects are necessarily actionable under New York construction law.

Continue reading “Construction Defects in New York; Part 1 of 6 – An Introduction”

Strings of a Marionette Puppet

Like the strings of a marionette puppet, after the completion of a New York construction project, there are various legal theories that serve as ties between the builder and the owner. For the builder, the sooner these lingering ties can be removed the less exposure they face for claims of defects. For the owners, the longer they are able to establish these connections, the longer they may have legal recourse against the builder for defects.

Continue reading “Strings of a Marionette Puppet”